Monday, February 10, 2014
New Deck Part 2
Work will start back again today with installation of the decking on the stairs, and hopefully some work on the railings.
The decking that was installed was been trimmed along the edge and caps were installed on all sides of the deck where the decking was already installed. They got the stair treads installed today.
Waiting for the trim. |
Putting trim around the edges. |
One section of rail and almost all the posts assembled. |
Part 3
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment